ClimateMaster 202 Training
ClimateMaster factory trainers will be conducting an intensive, 2-day instructional program on installation best practices, DXM2 controls, internal variable speed pumps and system design software. General geothermal installation/service practices will also be reviewed.
Topics covered include:
- Heat of extraction/Heat of rejection,
- Refrigeration Practices & Diagnostics,
- DXM2 Controls
- Loop Flushing
- Pumps and all 4 Loop Applications and Design
- Â vFlow and iGate Applications
- Installer Set-Up and Fault Code Retrieval
- Troubleshooting Guide and App
- Loop Design (both open and closed)
- Pump Selection and Sizing using Hand Calcs and Software
- Loop Flushing, Antifreeze & How to Verify
- Importance of Load Calcs
- Soil Conditions